
Company News & Updates — Learn more about our work

HYROSIS at LogiMAT 2025: Driving AMR Innovation Together

We were delighted to participate in Logistics & Automation Madrid 2025.

October 2026 – Present | Spain Project
Our team provided comprehensive on-site deployment services for the AMR project, covering robot hardware assembly, system installation, and on-site configuration. From hardware setup to system integration, we delivered end-to-end technical support to ensure smooth project implementation and reliable system operation, supporting deployment across overseas markets.

October 2026 | Spain Project
Our team provided professional on-site AMR assembly services, covering robot hardware installation, component setup, and system preparation. With experienced technicians and close teamwork, we delivered efficient on-site support, ensuring smooth assembly and reliable project execution through professional expertise and strong collaboration.

September – October 2026 | France Project
In September, our team carried out on-site technical support and project implementation work at the warehouse of a leading global cosmetics and beauty group in France. As part of the AMR deployment, we worked closely with the client and project partners to support system implementation, on-site commissioning, and operational testing.

July – September 2026 | Spain Project
Our team launched a new project with the Inditex Group, providing on-site AGV calibration training for the maintenance team at one of its distribution centers. Through hands-on technical guidance and standardized calibration procedures, we helped strengthen the client’s maintenance capabilities, improve accuracy, and support reliable long-term warehouse performance.

June – July 2026 | Czech Republic Project
Our team has been providing on-site AMR maintenance support in the Czech Republic for a global fashion retail brand since June 2026. We support the client’s team in robot troubleshooting and maintenance operations to ensure stable, reliable and efficient long-term system performance and continuous improvement. Through technical guidance, we help strengthen maintenance capabilities and resolve issues more effectively.

May – June 2026 | Spain Project
Our team provided on-site production support and system commissioning services for the Moving series autonomous mobile robots for a well-known international FMCG brand in Burgos, Spain. Our engineers continuously optimized robot performance and assisted with on-site troubleshooting to ensure efficient material transportation and reliable workflow execution and stable long-term system performance assurance.

March – April 2026 | Netherlands Project
These two months, our team delivered on-site maintenance services for a leading drugstore retail chain in the Netherlands. The project focused on warehouse transportation robots (AMR), where we carried out scheduled inspections, preventive maintenance, and comprehensive system diagnostics to ensure stable, efficient, and reliable long-term operational performance and system stability.

2025 – 2026 | Our Licence
As a high-tech AMR service provider, we hold the REA (Registro de Empresas Acreditadas) certification. This official accreditation validates our adherence to strict safety and labor standards required for onsite technical services in Spain. It reinforces our commitment to delivering professional, compliant, and safe automation solutions—from system implementation to after-sales support—for our European industrial clients.

February 2026 | Spain Project
During this project, our technical team was dispatched on short notice to support a major French sporting goods retail group in restoring its warehouse transportation robots to full operation. Working efficiently on site, we diagnosed system faults, carried out rapid repairs, and ensured the equipment resumed stable performance with minimal disruption to logistics operations and continuous reliable operations support.

January – February 2026 | Romania Project
Our team supported the early and successful go-live of Moving autonomous mobile robots in Romania, ensuring smooth deployment and stable operation. The robots leveraged SLAM technology to scan the environment after power-up and navigate the facility to perform material handling tasks. Through effective coordination and on-site technical support, we enabled rapid system commissioning.

January – February 2026 | Spain Project
Throughout the implementation and delivery phase, our on-site team worked closely with all stakeholders to ensure the smooth installation, testing, and commissioning of the system. In the subsequent stage, we provided on-site production support to help our clients continuously optimize equipment performance. In the maintenance phase, our dedicated service team keeps the system running efficiently.

2025 | Spain
Our team completed an upgrade of the occupational safety compliance training framework in Spain, building upon existing training foundations and aligning with European and local regulatory requirements. The project involved localized training system optimization, regulatory coordination, and cross-functional collaboration. Through structured execution, we strengthened compliance awareness.

October – December 2025 | Germany Project
Our team conducted on-site training for the OEG team in Germany through live demonstrations, interactive sessions, and hands-on experience sharing. The program was designed to enhance technical understanding, operational proficiency, and system management capabilities. By combining practical instruction with real-world scenarios, we empowered the OEG team to operate the system confidently.

September – November 2025 | Belgium Project
Throughout the implementation and delivery phase, our on-site team worked closely with all stakeholders to ensure the smooth installation, testing, and commissioning of the system. In the subsequent stage, we provided on-site production support to help our clients continuously optimize equipment performance. Our dedicated service team keeps the system running efficiently, safely, and sustainably.

August – September 2025 | Swiss Project
In this project, our team led the installation and commissioning of advanced intelligent warehouse robotics to transform the client’s operations. We ensured seamless integration with existing infrastructure while meeting stringent performance and safety standards. The project delivered a future-ready warehouse solution that boosted operational efficiency, reduced manual workloads.

May – June 2025 | Spain Project
Our team delivered comprehensive on-site services, including regular inspections, preventive maintenance, and fault diagnostics to proactively address potential issues before they impacted daily operations and overall system stability. By closely monitoring system performance, quickly resolving equipment malfunctions, and providing detailed technical guidance, we ensured the client’s robots operated efficiently.

September 2024 – March 2025 | Swiss Project
Our team served as Site Manager, expertly coordinating and managing all on-site activities to ensure the project’s timely and high-quality completion. Key responsibilities included resource management, team coordination, and ongoing supervision of construction progress. Additionally, we provided remote support to other project locations, promoting seamless operations and collaboration across sites.

June – September 2024 | France Project
In the France Project based in Toulouse, our team took on the role of Site Manager, handling the installation and commissioning of advanced systems. We ensured that all equipment met operational standards and functioned seamlessly, adhering to rigorous project requirements. Through precise coordination and technical expertise, we delivered a project that exemplified our commitment to quality, reliability, and on-schedule completion.

May – June 2024 | Italy Project
Our team delivered a systematic preventive maintenance program for autonomous mobile robots, ensuring stable operation and long-term system reliability. Key services included routine inspections, performance optimization, component servicing, and fault prevention. Through standardized maintenance procedures, we effectively reduced downtime and enhanced overall operational efficiency.

April – July 2024 | Germany Project
Our team led the installation and commissioning of advanced intelligent warehouse robotics to transform the client’s operations. We ensured seamless integration with existing infrastructure while meeting stringent performance and safety standards. The project delivered a future-ready warehouse solution, significantly improving efficiency, flexibility, and overall operational performance.